We have helped our clients:
  • Increase productivity by 25-75%
  • Reduce development costs by 50-60%
  • Accelerate time to market by 20-40%

SAFe provided the agility, visibility, and transparency needed to ensure we could integrate with numerous other efforts, get predictable in our delivery, and ensure timelines are met.

David McMunn
Director of COE, Fannie Mae

Building ELO PUB Templates

Documentation can be burdensome, especially in highly-regulated industries with ever-increasing release schedule pressure. For organizations that utilize DOORS Classic, Rhapsody or the ELM suite offered by IBM, documentation automation is available. This can be achieved through the use of IBM Engineering Lifecycle Publisher (PUB). PUB uses templates to scrape information from the aforementioned tools and put them in highly customized document layouts that are ready to be delivered to internal or external customers.

321 Gang can create these templates and allow release documentation to be simplified to a single button click.

Course Details

Building ELO PUB Templates

Typically 10 days to 2 months depending on the extent of configuration and data migration required.  Specific needs of the project may require a different timeline.

Remote or on-site delivery

  • Analysis and Planning
    • A 321 Gang Solutions Engineer will work with administrators and project leaders to understand the requirements of the deployment of the tools:
      • Server Configuration
      • Database selection
      • User access
  • Administration and Installation
    • Plan for the installation and document the system relative to the ELM tools and the related applications such as Reverse Proxy, LDAP and databases.
    • Install and document the installation of the Jazz Team Server, DOORS Next, Engineering Workflow Management(EWM), Engineering Test Management (ETM), and other ELM tools as desired.
    • Connect ELM to other tools used by the product development team.
  • Configuration and Usage Model
    • Work collaboratively with project leadership  to determine the initially needed configuration changes to support corporate governance including:
      • Custom DOORS Next Requirements Types
      • Custom EWM Workflows
      • Custom EWM Work Items
      • Global Configuration and Configuration Management, including EWM SCM strategies
      • EWM build automation strategies
      • Test management and ETM
      • Reporting and Dashboards
    • Implement the configuration changes
    • Build project and lifecycle templates of the custom configuration
    • Briefly document the usage model differences as compared to the standard templates
  • Training and Mentoring
  • Data Migration
    • Identify source data to be migrated into the ELM tools
    • Perform the migration
  • Continuously collaborate with the project users and administrators to make the 321 Gang Solutions Engineer unnecessary as soon as reasonably possible.

Request Information

  • This field is for validation purposes and should be left unchanged.

See what 321 Gang can do for your business

Share