We have helped our clients:
  • Increase productivity by 25-75%
  • Reduce development costs by 50-60%
  • Accelerate time to market by 20-40%

SAFe provided the agility, visibility, and transparency needed to ensure we could integrate with numerous other efforts, get predictable in our delivery, and ensure timelines are met.

David McMunn
Director of COE, Fannie Mae
Share

Engineering Requirements Management DOORS Next Fundamentals

This two-day training provides a comprehensive understanding of DOORS Next, focusing on its use and configuration. Participants will learn how to define, elaborate, organize, and manage both textual and graphical requirements, along with related information. The training can be tailored to either a 1-day or 2-day format depending on the topics of interest.

Day 1

  • Understand a basic overview of requirements management and IBM Engineering DOORS Next
  • Understand concepts and terminology for the Requirements Management application
  • Organize requirements information in a collaborative context
  • Capture requirements
  • Build requirement specifications

Day 2

  • Work with rich-text artifacts
  • Import requirements from documents and spreadsheets
  • Establish and analyze traceability relationships between artifacts and with other artifacts
  • Graphically model requirements
  • Manage change
  • Review requirement artifacts
  • Overview of managing requirements throughout a project lifecycle with Global Configuration Concepts
  • Report on requirements
  • This field is for validation purposes and should be left unchanged.

See what 321 Gang can do for your business

Share
Share