We have helped our clients:
  • Increase productivity by 25-75%
  • Reduce development costs by 50-60%
  • Accelerate time to market by 20-40%

SAFe provided the agility, visibility, and transparency needed to ensure we could integrate with numerous other efforts, get predictable in our delivery, and ensure timelines are met.

David McMunn
Director of COE, Fannie Mae

Inspect and Adapt WorkshopOptimize the quality of your implementation through relentless improvement

The importance of the Inspect and Adapt (I&A) workshop cannot be understated. It enables every Agile Release Train (ART) to improve every Program Increment (PI).

Since each PI represents a significant economic investment from the organization, it’s critical to assess the current state of the solution, which is demonstrated and evaluated by the ART teams during the I&A. During this one-day workshop you will be guided through the planning, preparation and execution of the Inspect and Adapt workshop.

Three main elements of the Inspect and Adapt workshop:

  • PI System Demo
  • PI Quantitative Assessment
  • Problem Solving Workshop

Course Details

Participated in an Agile Release Train (ART) and finished a Program Increment (PI)

On-Site

  • All members of the Agile Release Train (ART) including Agile teams, Business Owners and stakeholders
  • Release Train Engineers (RTEs) and Scrum Masters
  • Certified SAFe® Program Consultants (SPCs) and other change agents
  • A clear and aligned understanding of the state of the solution being developed, and the priorities for improvement going into the next PI Planning
  • How to use Lean problem-solving tools, such as Root-Cause Analysis, Pareto Analysis, and the ‘5 Whys’
  • Release Train Engineers (RTEs) and Scrum Masters will learn how to conduct a Program-Level retrospective to identify the issues for the problem-solving workshop.
  • How to prepare for and conduct the PI System Demo and measure performance
    of the teams and ART

Schedule Class or Request Information

  • This field is for validation purposes and should be left unchanged.

See what 321 Gang can do for your business

Share